P-125 Joint Reserve Center

得梅因,爱荷华州

Navy and Marines share this state-of-the-art training facility.

46个,毗邻爱荷华州道奇营的199平方英尺的预备役训练中心是为海军陆战队和海军预备役人员设计的,以提高部队的战备状态,为战斗做准备. The facility includes reconfigurable administration areas, 灵活的多用途教室和一个足够大的训练和仪式的操练厅. 配置, 配色方案, 在设计新设施时,饰面和声学发挥了重要作用,以满足用户的个性化需求,同时也为所有参观的人提供了一个有凝聚力的设计. 该项目还包括一个车辆维修设施和综合武术场.

The project was designed with future expansion in mind.

该基地经过战略性开发,可以在不破坏主要系统的情况下建造邻近的培训中心, such as the underground utilities or stormwater system. 在建筑工地外的受干扰区域种植原生草,以进一步维持农业环境.

Providing opportunity for cross-training with Iowa National Guard.

新设施建在道奇营附近的一块绿地上. 与主要利益相关者的定期会议确保了新的场地设计能够融入道奇营, one of the largest training facilities in the region. 这为爱荷华州国民警卫队提供了交叉训练的机会.

  • One-story, 46,199 SF Reserve Training Center
  • One-story, 3,254 SF Vehicle Maintenance Facility
  • 400 SF Marine Corps Martial Arts Pit
  • Offices/Administrative Areas
  • Classrooms/Training Space
  • 钻大厅
  • Indoor Simulated Marksmanship Trainer (ISMT)
  • Exterior covered weapons cleaning area
  • Concrete foundations, concrete floor, masonry walls
  • Drive-through maintenance bays
  • Tactical vehicle parking/storage area
  • Privately owned vehicle parking
  • Tactical security fencing
  • 体检室
  • 淋浴/更衣室
  • Anti-Terrorism/Force Protection
  • Implemented a collaborative, integrated design approach, 包括与概念设计工作坊相结合的可持续设计研讨会
  • 设计利用太阳方位和盛行风
  • 根据ASHRAE 90标准,达到38%的能耗.1-201
  • 所有主要建筑系统都进行了调试,包括建筑围护结构
  • 屋顶区域和至少50%的硬景观区域采用了高太阳反射率(SRI)材料
  • 管道装置是低流量和USEPA水感标签的产品
  • All landscaping provided is native or adapted species, 耐旱, and does not require irrigation
  • 安装材料符合ASHRAE 189规定的VOC和排放要求.1 Standard for the 设计 of High-Performance Green Buildings
  • 安装的材料包括回收成分超过成本10%的产品,并符合EPA采购指南的建议
  • Pending Guiding Principles Compliance for New 建设

相关项目

相关新闻 & 的见解

隐私政策

我们的网站使用技术为您提供个性化的体验. 根据我们的隐私政策,我们需要您同意使用cookies. By clicking “Accept,” you agree to our use of cookies.